Chamouchouane H-Frame
Project:
Chamouchouane H-FrameClient:
Hydro-QuébecStart Date – End Date:
2017Category:
Steel Poles![Chamanouchouane map](https://www.locweld.com/wp-content/uploads/2021/09/Chamouchouane_1-2.jpeg?x46426)
![Chamanouchouane map](https://www.locweld.com/wp-content/uploads/2021/09/Chamouchouane_2.jpeg?x46426)
![Chamanouchouane map](https://www.locweld.com/wp-content/uploads/2021/09/Chamouchouane_3.jpeg?x46426)
![Chamanouchouane map](https://www.locweld.com/wp-content/uploads/2021/09/Chamouchouane_4.jpeg?x46426)
![Chamanouchouane map](https://www.locweld.com/wp-content/uploads/2021/09/Chamanouchouane_map.jpeg?x46426)
Stats
kV
0
tons
0
feet
0
Project Highlights
Chamouchouane–Bout-de-l’Île, an essential project for the transmission system
Based on environmental studies, technical studies and meetings held in the project’s host community, Hydro-Québec made the following additions to its power system:
· Construction of a 735-kV line over 400 km between Chamouchouane substation in Saguenay–Lac-Saint-Jean and the Montréal metropolitan loop.
· Construction of Judith-Jasmin substation (735/120/25 kV)
· Diversion of a section of an existing 735-kV line over 19 km.