Emergency Restoration

Project:
Emergency Restoration
Client:
AltaLink
Year:
2017-2019
Stats
kV
0 & 500
tower types
0
trial assemblies
0
Project Highlights

Locweld fabricated a range of single and double circuit towers as spares for the emergency restoration of AltaLink’s existing and future transmission lines which are installed throughtout the province of Alberta. With these critical tower types already trial assembled and uploaded in our system, Locweld will have the fastest response time in an emergency situation.