Fanwood Substation
Project:
Fanwood SubstationClient:
PSE&GStart Date – End Date:
2013Category:
Substation Structures![substation component from Fanwood substation.](https://www.locweld.com/wp-content/uploads/2021/09/Fanwood-Substation_1-1.jpeg?x46426)
![](https://www.locweld.com/wp-content/uploads/2021/09/Fanwood-Substation_2-1.jpeg?x46426)
![fanwood substation map](https://www.locweld.com/wp-content/uploads/2021/09/fanwood_substation_map.jpeg?x46426)
Stats
kV
0
tons
0
Project Highlights
The North Central Reliability Project upgraded the transmission system and substations from 138kV to 230kV in north-central New Jersey. The project increased electric capacity required by New Jersey business and residents, increased transfer capability, provided better power quality, and reduced transmission system congestion.